Augustine House
Mike Otlet led the structural design of new 12,000m², four storey building. Completed in 2009 the teaching and library areas are connected by link bridges across a central atrium leading to a 500 seat multi-purpose hall. The exposed concrete frame is used for thermal mass and the piles for geo-thermal energy.
Client: Canterbury Christchurch University
Location: Canterbury, UK
Architect: Architectural Design Partnership
Structural Engineer: Atkins (Mike Otlet)
Main Contractor: Wates Construction
Completed: 2007






