Garth Lane Footbridge

Located in Grimsby, this new footbridge provides a link to a new development site within the town centre. OPS were appointed by steelwork fabricator, SH Structures, and undertook design and detailing of the bridge steelwork. Analysis of the bridge structure was undertaken including assessment of the dynamic response of the bridge, OPS also provided the connection design for the steelwork elements.

OPS also performed a thorough structural inspection of the previous bridge present on site, and justified its relocation downriver to a different site.

Client: SH Structures

Location: Grimbsy, UK

Structural Engineer: OPS Structures Ltd

Completed: 2021